With the energy crisis with the nineteen seventies [ten], having said that, Congress changed this construction to allow wholesale Levels of competition in electric power generation; amenities that made power additional successfully or utilised renewable Electrical power could enter the Market, although the transmission operators (ISOs and RTOs) mai